Northside Methodist Preschool
Before Pictures...
This summer, we were approached by Northside Methodist Preschool with an opportunity to renovate their bathrooms which had not been touched since the 50’s. This particular set of bathrooms was primarily used for their toddler classes and there was nothing “toddler” about the space. The sinks, urinals, etc. were all too high, they needed additional stalls, reconfigured storage and let’s not forget the paint and tile colors...
We met continuously with the client group during the 2015 school year and planned a start date that coincided with about 45 seconds after the children let out of summer camp. From that point on, it was a race to the finish to have everything completed, functional, clean and safe prior to the arrival of the little ones for the fall of 2016.
As you would expect, a project of this age did not walk gracefully across the finish line but we kept our eye on the goal with the client’s vision always in the forefront. We met our goal, in schedule and on budget. We are thankful for the trust that Northside Methodist Preschool had in us and are looking forward to many more projects with them.
Concept Models...
NMP - Proposed Plan View | NMP - Proposed Interior 4 |
---|---|
NMP - Proposed Interior 3 | NMP - Proposed Interior 2 |
NMP - Proposed Interior 1 | NMP - Proposed Axon 4 |
NMP - Proposed Axon 3 | NMP - Proposed Axon 2 |
NMP - Proposed Axon 1 |
Boys Bathroom | Boys Bathroom |
---|---|
Boys Bathroom | Girls Bathroom |
Girls Bathroom | Girls Bathroom |
IMG_3838 |